MedhaCloud
Lift & ShiftAzure MigrateAVDAKSSQL Managed InstanceHybridAzure ArcEntra IDAzure Site RecoveryBicep / TerraformFinOps Cost SavingsMicrosoft Gold PartnerLift & ShiftAzure MigrateAVDAKSSQL Managed InstanceHybridAzure ArcEntra IDAzure Site RecoveryBicep / TerraformFinOps Cost SavingsMicrosoft Gold Partner

Azure Migration Services

Azure Migrate. Azure Site Recovery. Bicep landing zones. Entra ID. Fixed-price SOW within 3-5 business days. 500+ migrations, 0 data loss, 30-40% typical savings vs on-prem.

// Typical Azure project
azure_migrate = enabled
landing_zone = bicep + terraform
replication = azure_site_recovery
identity = entra_id + ad_connect
cutover_window = 2-4 hrs off-hours
rollback = signed_off
cost_savings = 30-40% typical
0+
Migrations Delivered
0+
Years Azure Experience
0.00%
Uptime SLA Target
0
Data Loss Incidents
The Azure migration problem

What kills most Azure projects.

01 / 04 · Bill shock after lift-and-shift
0%

Over-provisioned VMs and orphaned disks quietly inflate the monthly Azure bill. Our assessment right-sizes every workload and applies Azure Hybrid Benefit — typical clients see 30-40% savings vs on-prem.

02 / 04 · VMs migrated in one weekend
0

Regional Medical Center moved 120 VMs from VMware to Azure Friday-to-Monday. Zero data loss, zero business-hours downtime, 3 hours total cutover time.

03 / 04 · Production databases moved
0.0TB

Advanced Manufacturing migrated 85 VMs and 5.8 TB from AWS to Azure with 100% data integrity. Production never stopped.

04 / 04 · Max cutover downtime
2-4hr

Our final cutover window runs off-hours. Azure Site Recovery does the replication, incremental sync handles deltas, and rollback is one-click if anything fails.

What's included

Azure done right. End to end.

01

Azure Migrate assessment

Discover, size, and cost-model every VM and database. Output is a fixed-price SOW within 3-5 business days covering compute, storage, network, and licence mix.

02

Azure Site Recovery replication

Continuous block-level replication from VMware, Hyper-V, or cloud sources to Azure. Deltas sync automatically so the final cutover window stays under 4 hours.

03

Database migration

SQL Server, MySQL, PostgreSQL, Oracle to Azure SQL Database, Managed Instance, or Azure VM — whichever matches your licensing and latency profile.

04

Identity & Entra ID

Azure AD Connect, Entra ID P1/P2, Conditional Access, MFA, and hybrid identity. Users land with SSO on day one — no re-provisioning required.

05

Landing zone + IaC

Bicep or Terraform landing zone with VNet, NSG, Azure Firewall, Key Vault, Log Analytics. Reproducible, version-controlled, ready for production.

06

Cost optimization & FinOps

Azure Hybrid Benefit, Reserved Instances, and right-sizing recommendations delivered after migration. Most clients see 30-40% savings vs their on-prem bill.

Delivery methodology

Four phases. Named owners.

01

Assess

Week 0-1 · Azure Migrate discovery, dependency mapping, fixed-price SOW. Includes target landing-zone design and cost projection.

02

Plan

Week 1-2 · Landing zone deployed (Bicep/Terraform), Entra ID configured, security baseline hardened, runbook + rollback signed off.

03

Migrate

Week 2+ · Azure Site Recovery replication, pilot wave (5-10 VMs), production wave cutover off-hours, delta sync before DNS flip.

04

Optimize

Hypercare + 30 days · Right-sizing, Reserved Instance purchase, monitoring + alerting, admin handover, optional retainer.

Package pricing

Fixed-fee Azure packages.

STARTER
Small environments, single subscription, minimal app dependencies
$5,0005-20 VMs
VMs5-20
Timeline2-4 wks
Training1 session
Hypercare7 days
Cutover2-4 hrs
REQUEST SOW →
Popular
BUSINESS
Production workloads, SQL databases, identity sync, hybrid prep
$15,00020-50 VMs
VMs20-50
Timeline4-8 wks
TrainingLive + recorded
Hypercare14 days
Cutover2-4 hrs
REQUEST SOW →
ENTERPRISE
Multi-subscription, hybrid, regulated workloads, dedicated architect
Custom50+ VMs
VMs50-1000+
Timeline8-16 wks
TrainingPersonalized
Hypercare30 days
CutoverWave-based
REQUEST SOW →

Per-VM alternative: $250 basic / $500 standard / $1,000+ premium. VMware $5k/$12.5k/$25k · Hyper-V $4.5k/$11k/$22k · AWS→Azure $6k/$14k/$28k.

From our clients

“Migrated 120 VMs from VMware to Azure over a weekend. Monday morning, all applications ran perfectly. Zero data loss, zero downtime during business hours. 48-hour migration time, 3 hours total downtime. Best investment we made.”

Jennifer Martinez — IT Director, Regional Medical Center · 120 VMs · VMware → Azure

FAQ

Frequently Asked Questions

How long does a typical Azure cloud migration take?+
Timeline depends on VM count, data volume, and complexity. Small migrations (5-20 VMs) typically complete in 2-4 weeks. Medium migrations (20-100 VMs) take 4-8 weeks. Enterprise migrations (100+ VMs) range from 8-16 weeks. Most data transfer happens over weekends to minimize business disruption.
Will there be any downtime during the migration?+
We minimize downtime by performing migrations during nights and weekends. Most migrations have only 2-4 hours of downtime during the final cutover. Applications typically experience no disruption during business hours. We schedule all major migration activities around your business needs.
Is there any risk of data loss during migration?+
Zero data loss guaranteed. Every migration includes pre-migration verification, real-time monitoring during transfer, and post-migration validation. We verify every VM, database, application, and file. 9+ years migrating servers, 0 data loss incidents across 500+ projects. All migrations include full backups.
What platforms can you migrate from to Azure?+
VMware vSphere, Microsoft Hyper-V, AWS (EC2, RDS, S3), Google Cloud Platform (GCE, Cloud SQL), physical servers (P2V migration), other Azure regions or subscriptions, and legacy infrastructure. If your workload runs on it, we can migrate it to Azure.
Can you migrate very large VMs and databases?+
Yes. We regularly migrate VMs with multiple TB of data and large enterprise databases. Standard package supports VMs up to 2 TB. Premium package supports unlimited sizes. For extremely large workloads, we use incremental replication to reduce migration time and implement strategies for Azure storage and compute.
How much does an Azure cloud migration cost?+
Pricing depends on VM count, workload complexity, and data volume. Project-based: $5,000 (5-20 VMs), $15,000 (20-50 VMs), custom (50+ VMs). Per-VM: $250 basic, $500 standard, $1,000+ premium (includes databases and applications). All prices include zero data loss guarantee, migration tools, and post-migration support. No hidden fees.

Move to Azure. Lose the guesswork.

Free Azure Migrate assessment. Fixed-fee SOW in 3-5 days. 30 days hypercare. 500+ migrations, 0 data loss.

GET FREE ASSESSMENT →OPEN CALCULATOR →

Microsoft Gold Partner · Azure-certified engineers · Fixed-fee SOW · 30 days hypercare

VIEW PLANS →
From Our Blog

Cloud Migration Strategies & Step-by-Step Guides

Cloud Services

50 Cloud Migration Statistics for 2026 — Success & Failure Rates

A comprehensive roundup of 50 cloud migration statistics for 2026 covering success rates, failure causes, migration costs, timelines, repatriation trends, and multi-cloud strategy data from Gartner, IDC, Flexera, and Forrester.

17 min readMar 14, 2026
Cloud Services

55 Cloud Computing Statistics for 2026: Spending, Migration & Adoption

55 cloud computing statistics for 2026 covering global spending ($679B), migration timelines, multi-cloud adoption, data center investment, and SMB cloud budgets with sourced data.

16 min readMar 14, 2026
Email Migration

Google Workspace to Microsoft 365 Migration: The Complete 2026 Playbook (Gmail, Drive, and Shared Drives)

A step-by-step migration playbook for moving from Google Workspace to Microsoft 365 covering Gmail to Exchange Online, Drive to OneDrive/SharePoint, identity migration, DNS configuration, and post-migration security — with tool comparisons and timeline estimates.

24 min readMar 13, 2026
Microsoft 365 migration

Case study: Hosting panel-based IMAP to Microsoft 365 Migration for government services in Virginia 

Client overview A government services agency in Virginia, with over 1,000 employees, had been using a hosting panel-based IMAP system for their email and communication needs. As the agency grew, they faced challenges in managing email effectively, ensuring data security, and fostering collaboration across teams. Given the critical nature of their services, the agency needed a […]

7 min readOct 24, 2024