Azure Migration Services
Azure Migrate. Azure Site Recovery. Bicep landing zones. Entra ID. Fixed-price SOW within 3-5 business days. 500+ migrations, 0 data loss, 30-40% typical savings vs on-prem.
What kills most Azure projects.
Over-provisioned VMs and orphaned disks quietly inflate the monthly Azure bill. Our assessment right-sizes every workload and applies Azure Hybrid Benefit — typical clients see 30-40% savings vs on-prem.
Regional Medical Center moved 120 VMs from VMware to Azure Friday-to-Monday. Zero data loss, zero business-hours downtime, 3 hours total cutover time.
Advanced Manufacturing migrated 85 VMs and 5.8 TB from AWS to Azure with 100% data integrity. Production never stopped.
Our final cutover window runs off-hours. Azure Site Recovery does the replication, incremental sync handles deltas, and rollback is one-click if anything fails.
Azure done right. End to end.
Azure Migrate assessment
Discover, size, and cost-model every VM and database. Output is a fixed-price SOW within 3-5 business days covering compute, storage, network, and licence mix.
Azure Site Recovery replication
Continuous block-level replication from VMware, Hyper-V, or cloud sources to Azure. Deltas sync automatically so the final cutover window stays under 4 hours.
Database migration
SQL Server, MySQL, PostgreSQL, Oracle to Azure SQL Database, Managed Instance, or Azure VM — whichever matches your licensing and latency profile.
Identity & Entra ID
Azure AD Connect, Entra ID P1/P2, Conditional Access, MFA, and hybrid identity. Users land with SSO on day one — no re-provisioning required.
Landing zone + IaC
Bicep or Terraform landing zone with VNet, NSG, Azure Firewall, Key Vault, Log Analytics. Reproducible, version-controlled, ready for production.
Cost optimization & FinOps
Azure Hybrid Benefit, Reserved Instances, and right-sizing recommendations delivered after migration. Most clients see 30-40% savings vs their on-prem bill.
Four phases. Named owners.
Assess
Week 0-1 · Azure Migrate discovery, dependency mapping, fixed-price SOW. Includes target landing-zone design and cost projection.
Plan
Week 1-2 · Landing zone deployed (Bicep/Terraform), Entra ID configured, security baseline hardened, runbook + rollback signed off.
Migrate
Week 2+ · Azure Site Recovery replication, pilot wave (5-10 VMs), production wave cutover off-hours, delta sync before DNS flip.
Optimize
Hypercare + 30 days · Right-sizing, Reserved Instance purchase, monitoring + alerting, admin handover, optional retainer.
Fixed-fee Azure packages.
Per-VM alternative: $250 basic / $500 standard / $1,000+ premium. VMware $5k/$12.5k/$25k · Hyper-V $4.5k/$11k/$22k · AWS→Azure $6k/$14k/$28k.
“Migrated 120 VMs from VMware to Azure over a weekend. Monday morning, all applications ran perfectly. Zero data loss, zero downtime during business hours. 48-hour migration time, 3 hours total downtime. Best investment we made.”
Jennifer Martinez — IT Director, Regional Medical Center · 120 VMs · VMware → Azure
Frequently Asked Questions
How long does a typical Azure cloud migration take?+
Will there be any downtime during the migration?+
Is there any risk of data loss during migration?+
What platforms can you migrate from to Azure?+
Can you migrate very large VMs and databases?+
How much does an Azure cloud migration cost?+
Move to Azure. Lose the guesswork.
Free Azure Migrate assessment. Fixed-fee SOW in 3-5 days. 30 days hypercare. 500+ migrations, 0 data loss.
Microsoft Gold Partner · Azure-certified engineers · Fixed-fee SOW · 30 days hypercare
Migrations Hub
All 12 migration practices — platforms, pricing, timelines.
Learn More →Cloud Migration Services
Full-service migration — assess, plan, cutover, hypercare.
Learn More →AWS Migration
EC2, RDS, S3, EKS — AWS 6Rs framework delivered end-to-end.
Learn More →Microsoft 365 Migration
Email, OneDrive, Teams, SharePoint — from $15/user.
Learn More →Cloud Migration Strategies & Step-by-Step Guides
50 Cloud Migration Statistics for 2026 — Success & Failure Rates
A comprehensive roundup of 50 cloud migration statistics for 2026 covering success rates, failure causes, migration costs, timelines, repatriation trends, and multi-cloud strategy data from Gartner, IDC, Flexera, and Forrester.
55 Cloud Computing Statistics for 2026: Spending, Migration & Adoption
55 cloud computing statistics for 2026 covering global spending ($679B), migration timelines, multi-cloud adoption, data center investment, and SMB cloud budgets with sourced data.
Google Workspace to Microsoft 365 Migration: The Complete 2026 Playbook (Gmail, Drive, and Shared Drives)
A step-by-step migration playbook for moving from Google Workspace to Microsoft 365 covering Gmail to Exchange Online, Drive to OneDrive/SharePoint, identity migration, DNS configuration, and post-migration security — with tool comparisons and timeline estimates.
Case study: Hosting panel-based IMAP to Microsoft 365 Migration for government services in Virginia
Client overview A government services agency in Virginia, with over 1,000 employees, had been using a hosting panel-based IMAP system for their email and communication needs. As the agency grew, they faced challenges in managing email effectively, ensuring data security, and fostering collaboration across teams. Given the critical nature of their services, the agency needed a […]